New England Battery Energy Storage System​

Energy Vault's first large scale Battery Energy Storage System (BESS) deployment in Australia leading the way for the New South Wales Government's Emerging Energy Program.

Project Overview

Collocated with ACEN Australia's 720 MW New England Solar project, Energy Vault will deliver two battery energy storage system (BESS) deployments totaling 400 MWh. The projects are split into a two-phase development delivering an initial 50 MW/100 MWh BESS and subsequently a 150 MW/300 MWh BESS.

Construction on both BESS deployments began in Q1 2025, with commercial operations targeted for 2025 and 2026. The BESS systems will be charged and discharged daily to help meet peak electricity demand in New South Wales by dispatching stored renewable energy from the co-located solar project. This is expected to reduce the region's reliance on coal-fired power generation.

Energy Vault's BESS deployments will utilize its B-VAULTTM  integrated battery storage solutions and VaultOSTM energy management system to store energy and orchestrate the entire sites operations, respectively. The BESS systems will be coupled with Siemens S120 inverters to enable advanced grid support functionalities. This collaboration between ACEN Australia and Energy Vault represents a significant investment in grid-scale energy storage to integrate renewable energy in the Australian market.

icon_checks
Customer: ACEN Australia
icon_checks
Location: New South Wales, Australia
icon_checks
Products: B-VAULT™ AC, VaultOS™
icon_checks
Peak Power Output: 200 MW​
icon_checks
Energy: 400 MWh​
icon_checks
Project Status: Under Construction

Project Delivery Highlights

Registry Editor-1
Tailor Made Solution

Energy Vault's B-VAULT™ was optimized specifically for the New England BESS project. The unique form factor incorporates inverters into the BESS module satisfying ACEN's inverter requirements while simultaneously reducing onsite construction scope and costs.

Project Management-2
Market Leading Project

Demonstrating Energy Vault's agility in adapting to new markets and customer needs, the New England BESS marks the first large-scale battery energy storage deployment in Australia for both Energy Vault and the New England region of New South Wales (NSW).

feat_icon_2
Collocated Operations

The New England BESS project is collocated with the 720MW New England Solar project which is also developed by ACEN Australia. The combined system will drive the NSW Government's Emerging Energy Program.

Circuit
Software-Enabled Startup and Operation

The VaultOS™ Energy Management System will control, manage and optimize the BESS operations, allowing for superior energy management capabilities.

"As New England Solar progresses toward completion, we are fortunate to not only have the opportunity to partner with the Energy Vault team in the development of energy storage systems, but to have the strong support and partnership of the Anaiwan First Nations and local community. It is our goal to reliably provide clean power in the most efficient and cost-effective manner possible, and today we are one step close to achieving that mission."

Tim Greenaway

Head of Construction, ACEN Australia